Surface well – Pakistan
July 15, 2020
Surface well – India
July 15, 2020

Surface well – Nepal

410$

The objective of Siqaya Project is to provide fresh water by drilling wells in countries where pure water is critically scarce. The Project is implemented in a number of countries around the world in order to make a radical and sustainable change in the life of poor families who suffer from thirst and the consequences of water scarcity.

Description

Watering wells project
– Surface well of Nepal: depth 15 meters, number of beneficiaries 5-10 people, drilling period 30 days, price 285 dinars.
– Sri Lanka surface well: depth 15 meters, number of beneficiaries 5-10 people, drilling time 30 days, price 285 dinars
– Deep artesian well India: depth 60 meters, the number of beneficiaries 5-10 families, drilling period 60 days, price 650 dinars.
– Surface well with faucets, pipes and suction machine Bangladesh: depth 15 meters, number of beneficiaries from 5-10 families, drilling period 30 days, price 750 dinars.
– Artesian well with faucets, pipes, suction machine and reservoir Bangladesh: depth 60 meters, number of beneficiaries from 5-10 families, drilling period 60 days, price 1100 dinars.
– Surface well Africa (Republic of Benin): depth 15 meters, number of beneficiaries 100 people, drilling period 80 days, price 1250 dinars.
– Deep artesian well Gaza: Depth 80 meters, the number of beneficiaries 3000 people, drilling period 60 days, price 5280 dinars.
– Surface well Africa (Madagascar): depth 15 meters, number of beneficiaries 100 people, drilling time 80 days, price 1250 dinars.
– Surface well Africa (Niger): depth 15 meters, number of beneficiaries 100 people, drilling time 80 days, price 1250 dinars.
– Surface well of Pakistan: depth 30 meters, number of beneficiaries 200 people, drilling period 30 days, price 1050 dinars.
– Surface well India: Depth 15 meters, number of beneficiaries 5-10 people, drilling period 30 days, price 285 dinars.
– Surface well of Bangladesh: depth 15 meters, number of beneficiaries 5-10 people, drilling time 30 days, price 285 dinars.
– Surface well Africa (Niger): depth 15 meters, number of beneficiaries 100 people, drilling time 80 days, price 1250 dinars.

Terms & conditions

Terms & conditions

  • By agreeing on the following terms and conditions, you are buying a well and assigning us to choose the location, drill and prepare the well to produce fresh water.
  • In Taalof Al Khair, we try, as much as possible, to drill wells near mosques and poor people.
  • Sometimes it is impossible to find water at the drilling locations, so Taalof Al Khair tries to find somewhere else to drill a well where water exists.
  • A photo-supported report of all phases of the project is submitted. The report covers the location choice, drilling and water extraction in this sequence. A sign bearing the well owner’s name is placed during the drilling phases.
  • Taalof Al Khair’s role ends when water is extracted from the well. The well’s maintenance is the responsibility of the locals benefiting from its operation.
  • All drilling phases are manual. Each well’s depth and wideness are as per the illustrative numbers.
  • In the event of; the assigner (the second party), terminating the contract prior to the drilling commencement, 25% of the amount will be deducted and the remaining thereof will be refunded. However, if the drilling has been already commenced, the entire amount will be nonrefundable.
  • The Project will be implemented in cooperation with Slslet Alrowad Contracting, which is the Company specialized in well drilling and mosque construction.
Reviews 0

Reviews

There are no reviews yet.

Be the first to review “Surface well – Nepal”

Your email address will not be published.

Start a Conversation

Hi! Click one of our member below to chat on Whatsapp

تواصل معنا على الواتساب
Call Now Buttonاتصل الان